| The Port of Topolobampo starts construction of cargo dock |
|
December 14, 2009 By own resources, the Port of Topolobampo, build a new dock of 200 meters length including a platform of 66 ml., with two dolphins on each side of the platform. The company FONATUR Construction will be responsible for the construction of the dock in a period of 9 months from December 2009 to end in August 2010. The work will cost approximately 63 million pesos. This work will increase the port infrastructure in the Multipurpose Terminal, which currently only has one docking position.
|
| Última actualización el Martes, 07 de Septiembre de 2010 09:05 |