Home
Inicio Port - City
Port - City
PORT CITY-LINK 

Relations between the Port and the City, means a permanent framework for management because they represent both mutual benefits due to part of their routine operation and growth are in the same territory. 

The Port of Topolobampo conducts ongoing efforts within the Port-City Link Program, referred within the objectives of its Master Plan. 

It is important to manage the port-city integration under a complementary scenario in addition to being an efficiency indicator of its role as promoter of local and regional development. 

To ensure a reasonably and accurate approach on how to integrate these trusted relationships between the Port and the City, it is pertinent to note closer the way that they originate and how arrive at the conditions as currently presented. 

Derived from the analysis of statistical information that was obtained from the Topolobampo population, they perceived positively to the Topolobampo Port by 62% while the Los Mochis population 60%. 

Among the actions undertaken include: 

1.- Participation in the construction of 300 linear meters of the Topolobampo Tourist Malecon
2.- The construction of the Pedestrian Walker "Cerro del Chivero"
3.- The Construction of the Square "Puerta de Mexico: Pacifico Norte".
4.- Guided tours by Topolobampo Port Staff, to all kind of education levels students .
5.- Donation of materials to schools in the Topolobampo Port.
6.- Maintenance of gardens located in the Port access.
7.- Cleaning of the highway Mochis - Topolobampo, by Topolobampo Port Staff.


SCHOOL VISIT "CETMAR"
VISIT OF GUASAVE, SINALOA ELEMENTARY SCHOOL


DONATION : 

EXECUTIVES FROM ADMINISTRACION PORTUARIA INTEGRAL DE TOPOLOBAMPO, SA DE C.V.: 

C.P. GILBERTO MILLAN GONZALEZ
ADMINISTRATION AND FINANCE MANAGER 

LIC. GUSTAVO ADOLFO TERAN FERNANDEZ
HEAD OF LEGAL DEPARTMENT 

TESTIFY BY: 

C.P. MORA PEDRO CABALLERO
TITULAR DEL ORGANO INTERNO DE CONTROL DE LA ADMINISTRACIÓN PORTUARIA 
INTEGRAL DE TOPOLOBAMPO, S.A. DE C.V.
 

BY INSTITUTO DE CAPACITACIÓN PARA EL TRABAJO DEL ESTADO DE SINALOA,
ING. MIGUEL ARTURO NORIEGA IBARRA 

BY CENTRO DE ESTUDIOS TECNOLÓGICOS DEL MAR No. 13
ING. JOSE VILLALOBOS PREDRO MEDINA 

BY ESCUELA SECUNDARIA TECNICA No.9,
PROFR. MIGUEL DOMINGUEZ. 

DONATED GOODS: computer equipment, Furniture and office equipment, small boats, MACHINERY AND 
EQUIPMENT FOR MANEUEVER. 



BY ADMINISTRACION PORTUARIA INTEGRAL DE TOPOLOBAMPO 

C.P. GILBERTO MILLÁN GONZALEZ
ADMINISTRATION AND FINANCE MANAGER 

IN REPRESENTATION OF THE SECUNDARIA TECNICA No.9
LIC. MIGUEL DOMINGUEZ 

DONATED GOODS: computer equipment, small boats, MACHINERY AND EQUIPMENT AND OTHER
EQUIPMENT for Maneuver. 



INAUGURATION OF THE TOPOLOBAMPO TURISTIC MALECON 

ACTO DE DEVELACION DE PLACA
VISTA DE MALECON TURISTICO DE TOPOLOBAMPO




Sincerely , 

Carlos Alfonso Solís Ginther 

Marketing Manager
API TOPOLOBAMPO



MECHANISMS FOR CITIZENS PARTICIPATION

Description: A mechanism to inform to the community activities and works carried out by Administracion Portuaria Integral de Topolobampo. 

Requirements: Give notice to the area of marketing to set date and time to make the event.

Administrative Division: Administracion Portuaria Integral de Topolobampo, SA de CV / Marketing Manager 

Who directed: Lic. Alfonso Solis Ginther / Lic. Rocio Soto Armenta 

Phone: (668) 8620127
Email: Esta dirección electrónica esta protegida contra spam bots. Necesita activar JavaScript para visualizarla
Esta dirección electrónica esta protegida contra spam bots. Necesita activar JavaScript para visualizarla
Website: www.puertotopolobampo.com.mx 
Última actualización el Jueves, 19 de Agosto de 2010 10:13
 

Acceso al Parque Industrial Pesquero S. N. Topolobampo, Sinaloa, México. Tel: (668) 8163970

Comentarios sobre este Sitio de Internet Comentarios y Sugerencias sobre este Sitio de Internet
 
ADMINISTRACIÓN PORTUARIA INTEGRAL DEL TOPOLOBAMPO - ALGUNOS DERECHOS RESERVADOS © 2012 - POLÍTICAS DE PRIVACIDAD Politicas de Privacidad